REEMAN Fly Boat AMR Deployed in a Zhejiang Smart Manufacturing Factory for Automated Elevator Delivery
At a smart manufacturing company in Zhejiang, China, REEMAN successfully deployed its Fly Boat Autonomous Mobile Robot (AMR) to automate parts transportation between the first-floor and fourth-floor warehouses. The entire on-site deployment was completed in just one day, including elevator integration and route configuration.
Instead of replacing or structurally modifying the existing factory elevator, REEMAN installed its own elevator control module to connect the robot's task system with the elevator control system. The Fly Boat now transports approximately 50–100 kg of production parts per delivery and completes around 50–70 full round trips per day, providing a real-world example of automated cross-floor logistics in an existing manufacturing facility.

Project Requirements: Connecting Two Warehouse Floors
The customer needed an automated solution to transport production parts between warehouses on the first and fourth floors. Both floors have materials requiring transportation, making bidirectional delivery an important part of the workflow. The goal was to reduce repetitive manual transport and establish an automatic material delivery process using the factory's existing elevator.
REEMAN deployed the Fly Boat AMR to carry material bins containing approximately 50–100 kg of production parts. The robot follows predefined routes and executes tasks through an automatic circulation workflow, without requiring workers to manually initiate each delivery. Some sections of the operating route are as narrow as approximately 1.2 meters, requiring appropriate navigation and route planning within the existing factory layout.
One-Day Deployment: Integrating the Existing Elevator Without Structural Modification
A key requirement was enabling the robot to use the existing factory elevator automatically. REEMAN engineers installed an elevator control module that connects the robot's task system with the elevator control system, coordinating elevator calling, floor selection, and robot entry and exit. The original elevator did not require structural modification.
During deployment, engineers configured navigation maps for the relevant floors and established the corresponding elevator waiting points, pickup locations, and delivery positions. Once configured, the robot can navigate to the waiting area, request the elevator, enter with its load, select the destination floor, exit upon arrival, and continue toward its assigned delivery point without workers manually operating the elevator.
Automated Cross-Floor Delivery Workflow
1. Navigate to the elevator waiting point
2. Automatically call the elevator
3. Enter the elevator with the material bin
4. Select the destination floor
5. Exit the elevator upon arrival
6. Continue navigation and complete the delivery
During commissioning, REEMAN engineers encountered a re-localization challenge near the first-floor elevator. After evaluating the site conditions, they adjusted the robot's approach direction so its front faced the elevator during re-localization. This optimization improved navigation reliability around the elevator area and helped establish a stable cross-floor transport route. The on-site deployment was completed in one day.

Real Factory Operation: Automated Parts Delivery Between the Fourth and First Floors
Following deployment, the Fly Boat entered regular factory operation, performing bidirectional parts transportation between the first and fourth floors. The robot completes approximately 50–70 full round trips daily, transporting material bins without requiring individual manual task commands or elevator operation by workers.
The following video was recorded after the robot had entered daily operation. It documents one actual transport route from the fourth-floor warehouse to a designated delivery point on the first floor.
Watch the real deployment: https://youtu.be/i_gTolr7ty8
Video Chapters
00:00 - Parts Pickup and Departure: The Fly Boat begins transporting production parts from the fourth-floor warehouse.
00:58 - Elevator Waiting: The robot waits for the elevator to travel from the fourth floor to the first floor.
01:26 - First-Floor Arrival: The robot reaches the first floor and continues autonomously toward its destination.
02:32 - Delivery Point Arrival: The robot reaches the designated delivery point.
Video note: The footage has been accelerated for viewing. The actual transport process shown takes approximately 9 minutes. The recording represents only one operating route within the factory's broader bidirectional logistics workflow.
Deployment Results and Operational Value
The Zhejiang project demonstrates how an existing multi-floor manufacturing facility can introduce automated material transport without replacing or structurally modifying its elevator. With REEMAN's elevator control module, floor mapping, and navigation configuration, the Fly Boat connects warehouse locations across floors through a continuous automated workflow.
Project at a Glance
| Location & Industry | Smart manufacturing company, Zhejiang, China |
| Robot | REEMAN Fly Boat AMR |
| Deployment Time | 1 day on-site |
| Transport Route | 1st–4th floor, bidirectional |
| Actual Load | Approx. 50–100 kg per delivery |
| Daily Transport | Approx. 50–70 full round trips |
| Narrowest Passage | Approx. 1.2 m |
| Task Mode | Preconfigured automatic circulation |
| Elevator Integration | REEMAN elevator control module; no structural modification to the existing elevator |
For the customer, the project establishes a repeatable process for transporting parts between warehouse floors while reducing the need for workers to accompany materials and manually operate elevators. It also demonstrates REEMAN's practical engineering capabilities, combining elevator control integration, autonomous navigation, and site-specific localization optimization within an existing manufacturing environment.
Frequently Asked Questions
Q1: What type of factory uses the REEMAN Fly Boat AMR in this project?
A: The robot is deployed at a smart manufacturing company in Zhejiang, China, where it transports production parts between the first-floor and fourth-floor warehouses.
Q2: Did the customer need to modify the existing factory elevator?
A: No structural modification was required. REEMAN installed an elevator control module to connect the robot's task system with the existing elevator control system, enabling automatic elevator calling, floor selection, and entry and exit.
Q3: How long did the deployment take?
A: REEMAN completed the on-site deployment in one day, including route configuration, elevator integration, and navigation adjustments.
Q4: How many transport tasks does the robot complete daily?
A: The Fly Boat completes approximately 50–70 full round trips per day between the first-floor and fourth-floor warehouses, carrying approximately 50–100 kg of production parts per delivery.
Q5: Can the robot transport parts between floors without manual task calling?
A: Yes. The robot follows predefined routes and an automatic circulation workflow. It can automatically use the elevator and continue its assigned transport task without workers manually calling the robot or operating the elevator for every delivery.
A Real-World Reference for Multi-Floor Factory Automation
The REEMAN Fly Boat deployment in Zhejiang demonstrates how autonomous mobile robots can connect warehouse locations across different factory floors through compatible elevator integration. With one-day on-site deployment, no structural modification to the original elevator, bidirectional parts transportation, and approximately 50–70 full round trips per day, the installation provides a practical reference for manufacturers considering cross-floor logistics automation.
The project also highlights the importance of evaluating elevator interfaces, navigation conditions, floor maps, and transport requirements before implementation. Successful automation depends on both robot capabilities and integration with the factory's existing infrastructure.
Explore REEMAN Factory Delivery Robot Solutions
Learn more about REEMAN's autonomous factory delivery robot technology and material handling applications.
Product details: REEMAN Dual Laser Fly Boat Pro Factory Delivery Robot